Posted Tue, 25/01/2011 - 08:48
Project Title: Building a highway bridge Gie - Ninh Binh (Package of 6)
Project in partnership with United Construction Co., Van Cuong.
Signed number: 04/10/2007 28/HDXD-VEC value: 695 billion, of which the Company In field assumed: 421 billion.
Highway bridge projects Gie - Ninh Binh has a length of 56km, the road has to cross six lanes and a design speed of 100 to 120km / h. In addition to the width of 22.5 m for road vehicles, on the new highway median strips between construction, emergency parking strip, strip safety and roadside grass. Once completed, the entire route will have 14 bridges and pass intersections; eight other intersections and the intersection with a road to link with existing transport systems.In addition, the project construction of systems of collection, people living underground sewer system of safety, traffic control and signal information ... Especially on the new expressway, the first construction contract will system of support facilities such as petrol stations, technical service, rescue, accommodation, advertising services ... along the route.